Eldeco EOE Construction Status

Live milestone tracker for Eldeco Echoes of Eden, Sector 22D, Yamuna Expressway. Foundation and excavation in progress as of June 2026. 3 towers (Haven, Elysian, Caelum), G+30, 558 units. Possession: January 2031. Updated monthly — a freshness no portal can replicate.

As of June 2026

Eldeco Echoes of Eden is in early-stage ground works: foundation/excavation is in progress across the 5-acre plot in Sector 22D, Yamuna Expressway, Greater Noida. The project (UP RERA UPRERAPRJ125342/02/2026) was RERA-registered in February 2026. All 3 towers — Haven, Elysian, Caelum — share the same phased construction schedule. Possession date per RERA filing: January 2031. This tracker is updated on the 1st of each month; the last update was .

At-a-Glance Status

~4 mo
Post RERA Registration
3
Towers (G+30 each)
558
Total Units
Jan 2031
RERA Possession Date
Overall estimated progress: ~8% (early ground works) — as of June 2026

Progress percentage is a conservative indicative figure based on visible ground activity and stage milestones. It is not an official developer or RERA metric. Verify milestone certificates on the UP RERA portal.

Construction Milestone Timeline

All milestone dates below are planned targets based on the January 2031 possession commitment under RERA. Actual milestone completion depends on construction progress and will be updated here monthly. The done and in progress states are clearly date-stamped so you can track velocity over time.

RERA Registration Done

Milestone 0 — Pre-construction

Project registered with UP RERA under UPRERAPRJ125342/02/2026. Land acquired by Eldeco Sohna Projects Ltd. Layout approval, building plans and YEIDA clearances filed. All buyer-facing disclosures uploaded to the UP RERA portal.

Completed: February 2026

Site Mobilisation & Boundary Fencing Done

Milestone 1 — Ground preparation

Site office established, contractor mobilised, boundary fencing and hoarding erected. Water and power connections commissioned for construction use. Soil investigation (geotechnical report) completed — required before raft design is finalised.

Completed: March–April 2026

Excavation & Foundation Pit In Progress

Milestone 2 — Ground works

Bulk earthworks excavation underway for all 3 tower footprints (Haven, Elysian, Caelum). Dewatering and shoring being carried out. This stage runs parallel across towers. Foundation pit dimensions being maintained as per structural drawings.

In progress — as of June 2026

Raft Foundation / Podium Works Planned

Milestone 3 — Sub-structure

Raft foundation pours for all 3 towers. Podium-level works including basement (if applicable), plinth, and ground-floor slab. This is the RERA "foundation milestone" that triggers the first construction-linked payment under the 30:40:30 plan.

Target: Q4 2026 – Q1 2027 (indicative)

Tower Slab Construction — Haven, Elysian, Caelum Planned

Milestone 4 — Super-structure

Reinforced-concrete slab-by-slab construction up all 3 towers to G+30. This is the longest phase (~24–30 months), progressing floor by floor. RERA milestone certificates are issued at the structure milestone, triggering the second construction-linked payment tranche.

Target: 2027 – 2029 (indicative)

Structure Top-Out (Terrace Slab) Planned

Milestone 5 — Super-structure complete

Final (G+30) floor slab cast on all 3 towers. External facade and waterproofing begin simultaneously. Terrace top-out is a visible milestone and is celebrated on-site — photos will be posted here.

Target: 2029 – early 2030 (indicative)

Finishing Works Planned

Milestone 6 — Interior finishes

Internal plastering, tiling, flooring (vitrified), electrical and plumbing fit-outs, VRV centralised AC system installation (every unit), kitchen carcass, wardrobe carcass, lifts (5 per tower), common-area finishes, landscaping, 75,000 sq.ft clubhouse works. RERA finishes milestone triggers the third construction-linked tranche.

Target: 2030 (indicative)

OC & Possession Handover Planned

Milestone 7 — Handover

Occupancy Certificate (OC) obtained from YEIDA. RERA-mandated possession notice issued to buyers. Final 30% payment collected. Physical handover with unit inspection, key handover, society formation (RWA). Stamp duty and registration on the sale deed.

RERA Possession: January 2031

All "planned" milestones show indicative targets. Actual dates depend on construction velocity and will be updated here as they occur. RERA allows the developer to apply for an extension per prescribed norms. Verify the latest milestone certificates on the UP RERA portal.

Per-Tower Status

The project has 3 towers — Haven, Elysian, and Caelum — each G+30 (ground + 30 upper floors). All three are in the same early-stage ground works phase as of June 2026.

Tower Haven

Haven

Excavation in progress. Foundation pit being prepared. G+30, approx. 186 units. All configurations (2 BHK to 4 BHK penthouse) available in this tower.

As of June 2026

Tower Elysian

Elysian

Excavation in progress. Foundation pit being prepared. G+30, approx. 186 units. Central tower in the 5-acre master plan layout.

As of June 2026

Tower Caelum

Caelum

Excavation in progress. Foundation pit being prepared. G+30, approx. 186 units. Adjacent to the 3-acre central greens.

As of June 2026

Monthly Site Photo Log

How this works: Vidastu Advisory conducts authorised site visits and uploads photos here on the 1st of each month. Photos are date-stamped so you can objectively track progress over time. No stock images or renders are used — only actual site photographs. The placeholders below will be replaced with real site photos as they are captured.
June 2026
Eldeco EOE site — June 2026 site view placeholder
June 2026 — Site Overview Replace with actual site photo from the site visit Add site photo
Eldeco EOE excavation June 2026 placeholder
June 2026 — Excavation Works Replace with actual excavation pit photo Add site photo
Eldeco EOE site entry June 2026 placeholder
June 2026 — Site Entry / Hoarding Replace with actual site entry photo Add site photo
May 2026
Eldeco EOE site May 2026 placeholder
May 2026 — Site Mobilisation Replace with actual May site visit photo Add site photo
Eldeco EOE boundary May 2026 placeholder
May 2026 — Boundary & Plot Replace with actual May boundary / plot view photo Add site photo

Photos are taken on authorised site visits by Vidastu Advisory. They represent the state of the site on the visit date and are not a representation by the developer. Earlier months will appear below as the archive grows.

Monthly Detailed Construction Write-ups

Each month, a detailed construction and market update is published with additional context on corridor developments, pricing status, and what to expect in the following month. This tracker page gives the visual/photo summary; the blog posts carry the full narrative.

Monthly updates are posted on or around the 1st of each month. Subscribe via WhatsApp to receive updates automatically.

Possession Date — What RERA Says

ItemDetail
RERA Project IDUPRERAPRJ125342/02/2026
RERA Possession DateJanuary 2031
DeveloperEldeco Sohna Projects Ltd (Eldeco Group)
Track RecordEst. 1985 · 200+ projects · 30,000+ families
Structure3 towers, G+30 each, 558 units, 5 acres
Channel PartnerVidastu Advisory, UPRERAAGT000309/01/2026

January 2031 is the date filed with UP RERA. Under RERA, the developer can apply for an extension with documented justification — it is NOT automatic. Buyers who book under the RERA-registered AFS have recourse under RERA Section 18 (refund + interest) if possession is delayed beyond the RERA-committed date without extension approval. Always cross-check the latest possession date on the UP RERA portal before booking.

Stay Updated or Book a Site Visit

Sachin Bansal will add you to the monthly construction update list and can arrange an authorised site visit — so you can see the progress in person before deciding.

Get Monthly Updates + Cost Sheet

Sachin Bansal (VP Sales) · Vidastu Advisory

No brokerage charged to buyers. By submitting you agree to be contacted on the number provided. We never share your details.

RERA Disclosure & Data Accuracy Notice

This construction tracker is maintained by Vidastu Advisory (UP RERA Channel Partner UPRERAAGT000309/01/2026), an authorised channel partner of the project registered under UPRERAPRJ125342/02/2026. Vidastu is not the developer or seller.

Milestone statuses, progress percentage and photo content reflect field observations at the time of site visits, not official developer or RERA communications. Always verify the latest RERA-filed milestone certificates, approved plans and possession date on the UP RERA portal before any payment commitment. Construction timelines are indicative and subject to revision.

Construction Status FAQs

What stage is Eldeco EOE construction at as of June 2026?
Foundation and excavation are in progress across all 3 tower footprints (Haven, Elysian, Caelum) on the 5-acre Sector 22D site. The project was RERA-registered in February 2026, so June 2026 is approximately 4 months post-registration — a normal and expected early-stage position for a G+30 project with a January 2031 possession date. Site has been mobilised with boundary fencing, contractor establishment, and geotechnical works completed.
Is January 2031 possession realistic given current progress?
Yes. For a G+30 project registered in February 2026, a January 2031 possession gives ~5 years of construction time. Eldeco Group has delivered 200+ projects to 30,000+ families since 1985. The RERA possession date is the developer's filed commitment. Excavation in June 2026 at the 4-month mark is consistent with a 2031 delivery. Construction typically accelerates significantly once the raft foundation and podium are complete.
How is this tracker different from what I see on 99acres or MagicBricks?
Portals display static brochure content and developer-supplied descriptions — they almost never publish monthly site photos or dated milestone updates. This tracker is updated by an authorised on-site channel partner every month. The date-stamped photo log gives you objective evidence of pace that no portal can offer. That said, always verify milestone certificates on UP RERA, which is the official record.
What happens if construction is delayed beyond January 2031?
Under RERA Section 18, if possession is delayed beyond the RERA-committed date without an extension approval, the developer must pay interest (at MCLR+1%) to buyers for every month of delay. Buyers also have the right to claim a full refund with interest. An extension requires UP RERA approval — it is not automatic. This buyer protection is a core reason to book only RERA-registered under-construction projects.