A complete step-by-step guide to booking Eldeco Echoes of Eden — direct booking, no separate EOI. As of July 2026, current availability is Caelum tower only (Haven and Elysian are fully booked; 2 BHK sold out). KYC documents, RERA verification, loan sanction milestones and the 30:40:30 payment plan, explained in order.
First-time homebuyers sometimes treat "booking a flat" as one action. In reality, booking Eldeco Echoes of Eden is a 9-step sequence — each with its own document list, cheque/RTGS amount, and RERA checkpoint. This guide walks you through all nine, in order, with the amounts and timelines you should expect. Read this before you make the direct booking payment — there is no separate token or EOI stage.
Quick Reference
- ProjectEldeco Echoes of Eden, Sector 22D YEW
- RERAUPRERAPRJ125342/02/2026
- Launch BSP₹9,300/sq.ft*
- Booking mechanismDirect — no separate token/EOI
- Full booking amountUp to 10% of BSP (Sec-13(1) cap)
- Payment plan30:40:30 construction-linked
- End-to-end timeline10–14 days to signed AFS
Step 1 — Initial Enquiry
Initial Enquiry (No EOI)
Payment: None. This is a zero-commitment stage.
What you do: Share basic KYC (name, phone, email, city, loose budget band, preferred configuration). Note: Eldeco no longer takes a separate Expression of Interest for this project — Haven and Elysian towers are fully booked, and current availability is in Caelum only (2 BHK is sold out; 3/4 BHK remain).
Why it matters: In a tower with limited remaining inventory, the difference between a 15F park-facing corner unit and a 4F non-corner unit is decided at this stage. Earlier enquiry = better pick within Caelum.
Step 2 — Site Visit & Unit Shortlist
Site Visit
Payment: None.
What you review: Master plan, tower layout, floor plans, sample unit (if ready), clubhouse plan, and the approved RERA brochure. Also walk the sector to understand orientation, road access, and neighbouring plots.
Output: A shortlist of 2–3 units across floor + configuration within Caelum (3/4 BHK — 2 BHK is sold out).
Step 3 — Direct Booking — 10% of BSP (No EOI)
Booking Amount — Paid Directly
Payment: Up to 10% of BSP (the Sec-13(1) statutory cap for under-construction bookings), paid directly — there is no separate EOI or token step at Eldeco EOE. For a 3 BHK+2T (1,550 sq.ft) at current BSP ₹1.44 Cr, this is ~₹14.4 lakh. Payable by cheque or RTGS in favour of the developer-specified escrow account. Never pay to an individual or channel partner personal account.
What you get: Unit-specific allotment letter with tower, floor, unit number, carpet area, and initial cost sheet.
RERA checkpoint: Before paying, verify the project on the UP RERA portal (rera.up.gov.in) using UPRERAPRJ125342/02/2026. Confirm the developer is registered and the project is in "Ongoing" status.
Step 4 — Execute the RERA Agreement for Sale (AFS)
Agreement for Sale — The Real Contract
Payment: Within 90 days, top up to 30% of BSP, plus stamp duty on the AFS (nominal — actual sale-deed stamp duty is at registry stage).
What it is: The RERA-mandated binding contract between you and Eldeco. It specifies unit details, total cost, payment plan, possession date, defect liability, and cancellation terms.
Why this step is non-negotiable: Under RERA, any builder collecting more than 10% without executing a registered AFS is in violation. Do not make any payment beyond 10% without AFS. Read the AFS carefully — particularly the possession date (a RERA-bound commitment) and the force-majeure clause.
Step 5 — Home Loan Application & Sanction
Loan Sanction
Payment: Bank processing fees (varies, typically 0.25–0.5% of loan amount).
Timeline: 7–14 days from application to sanction letter for a salaried profile. NRI and self-employed files take 2–3 weeks.
What you submit: Salary slips (3 months), Form 16 (2 years), bank statements (6 months), PAN, Aadhaar, property papers (builder provides), allotment letter, AFS.
Tip: Apply with 2 banks in parallel. Compare sanction letters on rate, tenure, processing fee, and part-prepayment terms. For a full bank-by-bank breakdown, read our Home Loan Guide for Yamuna Expressway 2026.
Step 6 — Follow the 30:40:30 Construction-Linked Plan
Payment Milestones
The 30:40:30 structure at EOE:
| Phase | % of BSP | Trigger Event | Typical Window |
|---|---|---|---|
| Booking | 10% | At AFS execution | Day 0 |
| Within Booking Phase | 20% | Before construction starts / on allotment | 30–60 days |
| Construction Phase | 40% | Slab-wise / milestone-linked | Spread 18–30 months |
| Final / Possession | 30% | At OC/CC & handover | At possession |
The 30:40:30 plan is construction-linked, meaning the developer invoices only when a RERA-linked milestone is achieved. If you're on a home loan, the bank disburses in tranches matching these milestones — so your EMI actually starts on partial disbursed amount, not full loan, during construction phase. This is a big cash-flow advantage over 20:80 or front-loaded plans.
Step 7 — Possession, OC & Handover
Possession Handover
Payment: Final 30% + stamp duty & registration charges (see Step 8).
What to verify: Occupancy Certificate (OC), Completion Certificate (CC), no objections from authority, IBMS corpus paid, and snag-list walkthrough with builder before you sign the handover letter. Read our full Possession & Construction Status Guide for the checklist.
Defect-liability: Per RERA, the builder is liable for structural defects for 5 years from possession. Record and report defects in writing within the first year for fastest resolution.
Step 8 — Sale Deed Registration & Mutation
Registry
Payment: Stamp duty (7% in UP for men, 6% for women) + registration charge (1%) on the agreement value. On the ₹1.44 Cr entry (3 BHK+2T) unit, that's roughly ₹10.1–11.5 lakh.
Where: Sub-registrar office with jurisdiction over Sector 22D, along with the builder's authorised rep.
Post-registry: Apply for mutation in revenue records — this legally transfers ownership recognition. Keep the original registered sale deed and mutation order in a bank locker.
Complete Document Checklist
What You Will Need (Resident Indian)
- PAN cardMandatory
- AadhaarMandatory
- Latest address proofMandatory
- 2 passport-size photosMandatory
- Cancelled chequeMandatory
- Salary slips (3 mo) / ITR (2 yrs)If applying loan
- Bank statements (6 mo)If applying loan
Additional for NRI / OCI Buyers
- Passport (all pages)Mandatory
- OCI / PIO cardIf applicable
- Visa / work permitMandatory
- NRE or NRO account detailsMandatory
- Power of Attorney (notarised)If booking remotely
- Overseas address proofMandatory
If you're an NRI, our full NRI Investment Guide covers FEMA, tax, TDS, and repatriation in depth.
Red Flags to Watch For
- Any ask to pay more than 10% before signed AFS. This is a RERA violation, full stop.
- Cheque/RTGS to a personal account. All payments must go to the developer's RERA-registered escrow account. Not the channel partner's account, not a promoter's account.
- Verbal possession-date commitments that don't match the RERA portal. The RERA-registered date is the legally binding one. Everything else is marketing.
- Missing cost-sheet items. Ensure your cost sheet explicitly breaks out GST, IBMS, club fees, power backup, parking, stamp duty, and registration. "All-in" numbers without breakup hide the actual obligation. Paste any quote into the free Quote Decoder to see the line-by-line breakup against the developer's published structure instantly.
Walk Through the Booking With a RERA Channel Partner
Our sales desk handles the full booking sequence end-to-end — from initial enquiry to registry, direct booking with no separate EOI — as a UP RERA registered partner